Skip to main content
Document Date

This applies to all vessels being worked at Northport. The period under noise-control mitigation requirements is 2100hrs to 0700hrs. The definition of hard-loading: ‘loading directly into an empty hold onto the tank tops and the loading of deck cargo directly into the side-runs and directly onto the hatch lids up to 1m above the hatch lid.’  

Version
1.0